Pure's Food Addition - Keeley
1725
wp-singular,portfolio_page-template-default,single,single-portfolio_page,postid-1725,wp-theme-bridge,bridge-core-3.0.8,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode-title-hidden,qode_grid_1400,qode-theme-ver-29.5,qode-theme-bridge,wpb-js-composer js-comp-ver-6.10.0,vc_responsive

Pure’s Food Addition

  • Construction of a 53,300-square-foot precast building addition connected to a 55-year-old food manufacturing facility for Pure’s Foods

  • The building addition has 6 complete dock positions, including 9×10 doors, dock levelers, hydraulic dock locks, and dock seals, and a 12×14 motor operated drive-in door

  • The new building is connected to the existing building via a new overhead doorway featuring a high-speed coiling door and a new man door connection

  • The entire site was brought to current MWRD storm water detention standards with the inclusion of two storm water detention ponds and one new storm water volume control pond

  • The exterior façade on the existing building was updated with the use of corrugated metal wall panels, new lighting, masonry repairs, and new storefront glass and glazing throughout

  • The existing office work includes a 1,800-square-foot office expansion, followed by abatement and complete remodel of the existing 5,300-square-foot office space.

  • All office work was phased so that the owner can remain in operation during construction.

CLIENT

Pure’s Food Specialties

LOCATION

2929 S 25th Ave Broadview, IL

SQ FT

53,000 SF

PRIMARY SECTOR