DHL Plainfield Mass Grading

Infrastructure work for a future 1.2mm SF Speculative Warehouse at corner of Ridge Road and 143rd Street.

SPECIFICATIONS

  • Over 1 Million Cubic Yards of Clay cut, excavated and filled
  • Two (2) Detention ponds with associated utilities to drain the site
  • 30 feet of structural fill material placed, and compacted
  • Underground utilities to intercept and redirect adjacent farm field drainage tile
  • Abatement and demolition of existing farm building and out-buildings
  • Removal of underground wells and septic structures

CLIENT

DHL

LOCATION

143rd Street Plainfield, IL

SQ FT

1,200,000 SF

PRIMARY SECTOR

Warehouse & Distribution