This multifaceted projected involved 22,500 square feet of tenant improvements.
The two-story facility required build-out of offices on both floors, a two-story reception area, warehouse space and a two-stop hydraulic elevator. Inside, the deck structure used bar joist, composite metal and concrete, and we installed 10,560 square feet of structural steel mezzanine. Warehouse access was accomplished using a precast concrete drive in ramp, and controlled with a new overhead door. Six new dock levelers were installed, as was 37 new parking spaces. The HVAC installation included seven new rooftop units with economizers and programmable thermostats.
© 2024 Keeley Construction, Inc. | All Rights Reserved